TOO

TOO
Open Access
REC
Energy Meters
TOO No Date Subject
10 15-04-2013 Solar Power Plants – Metering Protocol for Captive Solar Power Plants in the State – T.O.O. – Issued – Regarding.
10 28-02-2014 Location of interface meters for all the Open Access Generators (CPPs, IPPs & MPPs) including Consumers – Regarding.
24 24-04-2013 APTRANSCO – Transmission – Interface metering at G-T & T-D boundary points – Standardization of CTs & PTs – Instructions Issued.
74 04-04-2015 Location of interface meters for all the Open Access Generators (CPPs, IPPs & MPPs) including Consumers – Amendment to TOO-10 dt:28.02.2014 -Regarding.
394 19-01-2012 APTRANSCO - Guide lines for wiring of tariff meters of Generators / Bulk load consumers - Orders - Issued.
488 17-03-2012 Standardization of Metering CT ratios and secondary burdens of metering CTs and PTs - to adopt 0.2S class metering CTs instead of 0.2 class as being followed now - Orders Issued.
507 15 -03-2011 Testing of metering CTs and PTs procured by the consumer/generator – Conducting the tests in the third party laboratory – Regarding.
537 23-03-2010 AP Transco – Commercial – Energy Billing Centre – Testing of Energy meters of Generators, T-D Boundary meter points and Consumers – Instructions accorded.
914 11-09-2018 APTRANSCO - PSD Fund - Implementation of Scheduling, Accounting, Metering and Settlement of Transactions in Electricity (SAMAST) in APTRANSCO, Andhra Pradesh - Approval accorded - Regarding.
Settlements
SCADA